In Primavera P6

Change a Gantt Chart Bar's Label

Change a Gantt Chart bar's label is Bar Labels tab; Add / Delete; Position and Label; OK or Apply

P6 Gantt of sample EC00515. Activity names sit as labels beside the bars.
Those names are bar labels. Bar Labels is a layout tab, not a text attachment.

What a planner means

Change a Gantt Chart bar's label is Oracle Change a Gantt Chart bar's label (and Oracle Change a Gantt Chart bar's label - under Gantt Chart). Select the bar. Bar Labels tab. Add or Delete a label. Change Position and Label. OK, or Apply to view without closing. The two titles do not print the same menu. The Filtering-style page prints View, Top Layout Options, Bars and click the Position / Label field. The Gantt Chart sibling prints View, Bars (or Layout Options bar → Bars) and double-click the Position / Label column. It is a how-to. It is not stored as its own table. It does not create, edit, or delete a relationship. It is not Change a bar in the Gantt Chart, not Change a Gantt Chart bar's filter / settings / style / timescale, not Limit Text Label Characters, not Attach Notebook, not a text attachment, not the Gantt bars object, not TASKPRED, not EPPM Configuring Activity View Gantt Chart Bars label clicks copied onto Professional, and not Microsoft Format Bar.

Oracle does print how-tos titled Change a Gantt Chart bar's label and Change a Gantt Chart bar's label - under Gantt Chart. Oracle does not print a menu item named Change a Gantt Chart bar's label. Do not invent View > Change a Gantt Chart bar's label.

Oracle Change a Gantt Chart bar's label (Professional):

  • "Display the Gantt Chart, then choose View, Top Layout Options, Bars."
  • "Select the bar."
  • "Click the Bar Labels tab. To add a label to your bar, click Add at the bottom of the Bar Labels tab. To delete a label from your bar, select the label and click Delete at the bottom of the Bar Labels tab. To change the position of a label, select the label, click the Position field, and select a new position. To change a label's display value, select the label, click the Label field, and select a new value."
  • "Click OK. To view your changes without closing this dialog box, click Apply."

That page fetched prints no Layout Options bar, no View, Bars, no double-click, no Save, and no Yes. Do not invent those on that page.

Oracle Change a Gantt Chart bar's label - under Gantt Chart (Professional):

  • "Choose View, Bars. You can also click the Layout Options bar and choose Bars."
  • "Select the Gantt Chart bar for which you want to change the label."
  • "Click the Bar Labels tab."
  • "To add a label to a bar, click the Add button at the bottom of the Bar Labels tab."
  • "To remove a label from a bar, select the label you want to remove and click the Delete button at the bottom of the Bar Labels tab."
  • "To change the position of a label, select the label for which you want to change the position, then double-click the Position column and select a position from the list."
  • "To change the label's display value, select the label for which you want to change the display value, then double-click the Label column and select a display value from the list."
  • "Click OK. To view your changes without closing this dialog box, click Apply."

That page fetched prints no View, Top Layout Options, Bars, no Position field / Label field (it prints columns), no Save, and no Yes. Do not invent those on that page. Do not collapse the two titles.

Change a bar in the Gantt Chart is a different how-to. Bar Labels is one tab among Display / Name / Timescale / Filter / style tabs. See Change a Bar in the Gantt Chart.

Limit Text Label Characters is a different object. A character cap on the General tab of Bar Chart Options. It does not add, delete, or pick a label field. See Limit Text Label Characters.

Attach Notebook is a different how-to. A notebook item as a Bar Labels pick. See Attach Notebook.

Gantt bars is a different object note. The Bars dialog as layout settings. See Gantt Bars Are Layout Bar Definitions, Not an XER Table.

Professional vs EPPM

Professional — two menus, do not mix them. One page: display the Gantt Chart; View, Top Layout Options, Bars; Bar Labels; Add / Delete; click Position field / Label field; OK or Apply. Gantt Chart sibling: View, Bars / Layout Options bar → Bars; Bar Labels; Add button / Delete button; double-click Position column / Label column; OK or Apply. No Save on those pages.

EPPM web — Oracle Configuring Activity View Gantt Chart Bars: click a label; Label Field list; Color; Add menu → Label. That page fetched does not print View, Bars, View, Top Layout Options, Bars, Position column, or Bar Labels tab. Do not copy Professional Bar Labels / Position onto EPPM. Do not copy EPPM Label Field / Add menu onto Professional.

Primavera Cloud is a different product. Do not copy it here.

XER

The how-to is not an XER table. Oracle’s project XER map TOC has no BARLABEL / GANTTLABEL / LAYOUTLABEL table. Do not invent a view %T. Changing a bar's label does not write TASK. Layouts travel as .plf. A Viewer cannot reconstruct that the planner used this how-to.

Microsoft Project

Microsoft Project can put text on Gantt bars. Do not map that as P6 Change a Gantt Chart bar's label. Do not claim MPXJ writes a real MPP.

Don't

  • Invent View > Change a Gantt Chart bar's label, or invent Save / Yes on these how-tos.
  • Copy View, Bars / double-click column onto the Top Layout Options page, or View, Top Layout Options, Bars / click field onto the Gantt Chart sibling.
  • Collapse this onto Change a bar, Limit Text Label Characters, Attach Notebook, or the Gantt bars object.
  • Copy EPPM Label Field / Add menu onto Professional, or Professional Bar Labels tab onto EPPM.
  • Invent a BARLABEL XER table, or reconstruct the how-to from TASK dates.
  • Map MSP bar text as this how-to.
  • Claim MPXJ writes a real MPP.